Battery Energy Storage Systems

Reliable power.
Even when
the grid fails.

For Philippine enterprises where downtime costs measured in millions per hour — manufacturing, hospitals, telecom, transit, data centers — BridgePoint delivers Battery Energy Storage Systems through LCTSI, a PCAB Category A licensed contractor with deployments at MERALCO, MRT-3, NGCP, KEPCO, EDC, Globe Telecom, Petron, and Philippine Navy.

BESS Use Cases

Storage is strategic.
Not just backup.

Modern BESS deployments serve far more than emergency power. They shave peak demand charges, smooth solar/wind variability, provide grid services, and enable RCOA load shaping strategies.

Backup Power & UPS

Mission-critical sites — hospitals, data centers, MRT systems — where seconds of downtime cause cascading failures. BESS provides instant transfer with longer runtime than diesel.

Peak Shaving

Demand charges in PH commercial tariffs can exceed energy charges. BESS discharges during peak windows — cutting your demand bill significantly without changing consumption.

Solar Time-Shifting

Solar generates midday. Many loads peak in early evening. BESS captures midday solar overflow and discharges in evening — maximizing self-consumption and savings.

Industrial Process Stabilization

Heavy industrial loads (smelters, large motors, welders) create voltage sags and dips affecting sensitive equipment. BESS provides millisecond response to maintain power quality.

Grid Services Revenue

Large BESS can provide frequency regulation, voltage support, and reserve capacity to the grid — generating revenue from NGCP or the Wholesale Electricity Spot Market.

RCOA Load Shaping

Contestable customers with time-of-use RES contracts can charge BESS during low-rate hours and discharge during high-rate hours — turning storage into pure margin.

Our BESS Partner

Backed by LCTSI.
Proven in PH critical infrastructure.

Lead Core Technology System Inc. (LCTSI) is BridgePoint's primary BESS execution partner. PCAB-licensed Category A Electrical Works contractor with a multi-decade track record across Philippine critical infrastructure — battery supply, installation, testing, commissioning, and preventive maintenance.

When the country's biggest power utilities, mass transit systems, and national defense agencies need stored energy, LCTSI is one of the names they call.

MERALCO
MRT-3
NGCP
KEPCO
EDC
Globe Telecom
Petron
PH Navy
+ more
PCAB A
Category A Electrical Works License
End-to-End
Supply · Install · Test · Maintain
24/7
Preventive maintenance & emergency response
Multi-Chem
Lithium-Ion · VRLA · Flow battery technologies
What's Included

End-to-end lifecycle services.

🔋

Supply

Sourcing batteries, BMS, inverters, switchgear from certified manufacturers

⚙️

Installation

Engineering, electrical work, commissioning under PCAB Category A scope

Testing

Performance testing, acceptance trials, capacity validation

🛠️

Maintenance

Preventive maintenance contracts, condition monitoring, end-of-life management

Let's Scope Your BESS Project

Tell us what you
need to protect.

Share your load criticality, peak demand profile, and downtime tolerance. We'll size the right system and prepare a proposal — including financing options where applicable.